| Module | ops.06 · drill · ops, docs · Pass 11 · 1 to 2 h |
| You build | docs/runbooks/DependencyUpgrade.md |
| Tests | course/tests/ops.06 (named below, with why each exists) |
| Needs | none |
| Used by | no code call site; this is an independent artifact |
| Milestone | MS-P11 |
- Tie each claim to the exact platform evidence that
Drill: breaking dependency upgrade produces.
- State the owner, success condition, and recovery action before declaring the work complete.
- Record unresolved assumptions so the next review can test them.
A breaking dependency release can change runtime behavior without changing your source-level contract. This drill practices containment and a reproducible rollback.
Inspect the resolved dependency graph and release notes. Change one dependency, keep lockfiles, run the focused contract suite, and compare the same load profile before deployment.
Upgrade the designated major version in a scratch branch. Build, run native and contract tests, then compare latency and error distributions with the last known good image. Deploy only after the gates pass.
| Test | KIND | Checks | Why it matters downstream |
|---|
test_artifact_paths_are_declared | artifact | Confirms the submitted paths and required evidence exist, so a plausible narrative cannot pass without the reviewable deliverable. | |
| # | Pitfall | Symptom | Caught by |
|---|
| 1 | The canary advances before the rollback trigger is recorded | The exercise reports success without proving the old format or route can be restored. | test_artifact_paths_are_declared |
| 2 | The team watches request errors but omits the migration-specific signal | A partial rollout can corrupt or strand work while the generic health check stays green. | test_artifact_paths_are_declared |
| 3 | No owner records the decision and verification evidence | The next on-call cannot tell whether the incident is contained. | test_artifact_paths_are_declared |
| Direction | Module | Connection |
|---|
| Back | craft.15 | Read this declared prerequisite before producing the artifact; use it to verify the relevant contract or evidence. |
| Back | ops.05 | Read this declared prerequisite before producing the artifact; use it to verify the relevant contract or evidence. |
| Resource | What to inspect |
|---|
| Incident drill catalog | Compare this inject with the adjacent failure drills and use the same containment and verification fields. |