| Module | ops.04 · drill · ops, docs · Pass 11 · 1 to 2 h |
| You build | docs/runbooks/KvV2Migration.md |
| Tests | course/tests/ops.04 (named below, with why each exists) |
| Needs | craft.13 |
| Used by | no code call site; this is an independent artifact |
| Milestone | MS-P11 |
- Tie each claim to the exact platform evidence that
Drill: KV v2 migration produces.
- State the owner, success condition, and recovery action before declaring the work complete.
- Record unresolved assumptions so the next review can test them.
A format change affects every prefill/decode boundary and stored block. A partial rollout can mix fp8 payloads with f16 readers.
Before changing writers, verify v1/v2 negotiation, v2 scale metadata, peer capabilities, and spare capacity. Protect the no-loss invariant and keep a tested downgrade.
Canary one engine pair on a known fixture. Confirm v2 hashes, transfer and reconstruct blocks, then raise v2 traffic while watching negotiation failures and request errors. Roll back the writer flag if any peer lacks support.
| Test | KIND | Checks | Why it matters downstream |
|---|
test_runbook_has_operational_gates_and_recovery | artifact | Checks that the runbook names an owner, preconditions, canary gate, rollback, verification, both formats, scale, and hash evidence. | The example canary, format hashes, and recovery are concrete requirements the on-call can verify. |
| # | Pitfall | Symptom | Caught by |
|---|
| 1 | The canary advances before the rollback trigger is recorded | The exercise reports success without proving the old format or route can be restored. | test_runbook_has_operational_gates_and_recovery |
| 2 | The team watches request errors but omits the migration-specific signal | A partial rollout can corrupt or strand work while the generic health check stays green. | test_runbook_has_operational_gates_and_recovery |
| 3 | No owner records the decision and verification evidence | The next on-call cannot tell whether the incident is contained. | test_runbook_has_operational_gates_and_recovery |
| Direction | Module | Connection |
|---|
| Back | craft.13 | Read this declared prerequisite before producing the artifact; use it to verify the relevant contract or evidence. |
| Back | ops.03 | Read this declared prerequisite before producing the artifact; use it to verify the relevant contract or evidence. |
| Resource | What to inspect |
|---|
| Incident drill catalog | Compare this inject with the adjacent failure drills and use the same containment and verification fields. |