| Module | field.03 · practice · docs · Pass 11 · 1 to 2 h |
| You build | docs/engagement/performance.md |
| Tests | course/tests/field.03 (named below, with why each exists) |
| Needs | none |
| Used by | no code call site; this is an independent artifact |
| Milestone | MS-P11 |
- Tie each claim to the exact platform evidence that
Mock engagement: performance engagement produces.
- State the owner, success condition, and recovery action before declaring the work complete.
- Record unresolved assumptions so the next review can test them.
A performance engagement should answer a customer question with repeatable measurements. It must separate bottlenecks from noisy environmental effects.
Agree on workload, baseline, success threshold, system configuration, and stop conditions before testing. Preserve reproducibility and explain statistical spread.
Run the same open-loop request mix against the baseline and candidate. Report throughput, TTFT, TPOT, errors, and saturation. Use the perf bisect when a change creates a meaningful regression.
| Test | KIND | Checks | Why it matters downstream |
|---|
test_artifact_paths_are_declared | artifact | Confirms the submitted paths and required evidence exist, so a plausible narrative cannot pass without the reviewable deliverable. | |
| # | Pitfall | Symptom | Caught by |
|---|
| 1 | The deliverable records a conclusion without its customer evidence | Another engineer cannot reproduce the sizing or recommendation. | test_artifact_paths_are_declared |
| 2 | An assumption is written as a measured fact | The engagement plan can promise capacity or security the system has not demonstrated. | test_artifact_paths_are_declared |
| 3 | The next owner and decision gate are missing | Work stalls at handoff even when the technical work is complete. | test_artifact_paths_are_declared |
| Direction | Module | Connection |
|---|
| Back | field.02 | Read this declared prerequisite before producing the artifact; use it to verify the relevant contract or evidence. |
| Back | load.01 | Read this declared prerequisite before producing the artifact; use it to verify the relevant contract or evidence. |
| Back | craft.16 | Read this declared prerequisite before producing the artifact; use it to verify the relevant contract or evidence. |
| Resource | What to inspect |
|---|
| Mock engagement sequence | Carry the evidence and open decisions into the next customer-facing artifact in the sequence. |