| Module | field.04 · practice · docs · Pass 11 · 1 to 2 h |
| You build | docs/engagement/poc.md |
| Tests | course/tests/field.04 (named below, with why each exists) |
| Needs | none |
| Used by | no code call site; this is an independent artifact |
| Milestone | MS-P11 |
- Tie each claim to the exact platform evidence that
Mock engagement: POC and evaluation produces.
- State the owner, success condition, and recovery action before declaring the work complete.
- Record unresolved assumptions so the next review can test them.
A proof of concept needs a decision at its end. Evaluation criteria chosen after seeing results invite cherry-picking.
Set acceptance thresholds, representative tasks, comparison baseline, data handling, and rollback before the first run. Include operational and safety behavior as well as quality.
Choose a small evaluation set with held-out cases. Compare candidate and baseline under a fixed seed and report quality, latency, cost, refusal behavior, and failure examples. State what the sample cannot establish.
| Test | KIND | Checks | Why it matters downstream |
|---|
test_artifact_paths_are_declared | artifact | Confirms the submitted paths and required evidence exist, so a plausible narrative cannot pass without the reviewable deliverable. | |
| # | Pitfall | Symptom | Caught by |
|---|
| 1 | The deliverable records a conclusion without its customer evidence | Another engineer cannot reproduce the sizing or recommendation. | test_artifact_paths_are_declared |
| 2 | An assumption is written as a measured fact | The engagement plan can promise capacity or security the system has not demonstrated. | test_artifact_paths_are_declared |
| 3 | The next owner and decision gate are missing | Work stalls at handoff even when the technical work is complete. | test_artifact_paths_are_declared |
| Direction | Module | Connection |
|---|
| Back | field.03 | Read this declared prerequisite before producing the artifact; use it to verify the relevant contract or evidence. |
| Back | L6.7 | Read this declared prerequisite before producing the artifact; use it to verify the relevant contract or evidence. |
| Back | ag.09 | Read this declared prerequisite before producing the artifact; use it to verify the relevant contract or evidence. |
| Resource | What to inspect |
|---|
| Mock engagement sequence | Carry the evidence and open decisions into the next customer-facing artifact in the sequence. |