Skip to content

Defend your system

Moduleiv.01 · proof · docs · Pass 11 · 1 to 2 h
You builda written review with supporting evidence
Testscourse/solve/iv.01 (q1 is self-graded against course/rubrics/design-review.md)
Needsnone
Used byno code call site; this is an independent artifact
MilestoneMS-P11
  • Tie each claim to the exact platform evidence that Defend your system produces.
  • State the owner, success condition, and recovery action before declaring the work complete.
  • Record unresolved assumptions so the next review can test them.
Terminal window
ol start iv.01
ol tests iv.01
ol check iv.01

A technical defense tests whether you understand the system you built and can explain its limits to another engineer.

Answer from evidence. State the constraints, rejected alternatives, failure behavior, and a number you can reproduce. Admit when data is unavailable and name how you would obtain it.

Defend why the engine and gateway use separate HTTP and gRPC boundaries. Describe how a rolling API migration behaves during a worker restart, then calculate one capacity limit from the design.

Write docs/defense/answers.md as the worked reflection or design review. Answer each line of course/rubrics/design-review.md with evidence from the completed system, then self-grade q1; each no becomes a review note with an owner and next step. The check verifies the artifact and records the rubric self-grade.

#PitfallSymptomCaught by
1Treating version selection or a document claim as implicitA reader or client cannot determine which contract or evidence applies.artifact and rubric self-grade
2Skipping the failure pathThe successful example works, but malformed input or rollback breaks the system.artifact and rubric self-grade
3Omitting a named owner and recovery conditionThe artifact cannot guide an operator when conditions change.artifact and rubric self-grade
DirectionModuleConnection
Backreview.03Read this declared prerequisite before producing the artifact; use it to verify the relevant contract or evidence.
Backfield.07Read this declared prerequisite before producing the artifact; use it to verify the relevant contract or evidence.
ResourceWhat to inspect
Course system contractUse the current contracts and system boundaries as evidence when defending this review.