Skip to content

Glossary: Field Engineering

Every term Field Engineering defines, from A to Z, with the section that teaches it. A section that uses a term from elsewhere, in this book or another, also lists it under “Concepts from other sections” at the top of the page.

74 terms

  • Data residency: where data is stored and processed, often a contractual requirement. Taught in 8.6 Answering the security questionnaire
  • Deployment hypothesis: a written, sized proposal (model, tier, GPU count, cost) built from discovery facts and meant to be tested by a benchmark. Taught in Chapter 1: Discovery
  • Discovery record: the written output of discovery, listing findings with evidence, stakeholders, constraints, the decision and its date, and the next action. Taught in 8.1 Writing the discovery record
  • DPA: the data processing agreement that GDPR Article 28 requires between a controller and a processor. Taught in Chapter 6: Commercials and Security
  • Fallback: the known-good path (the manual workflow or the previous route) that restores service during an incident. Taught in 8.7 Handing off operations
  • Knee: the point on the latency-throughput curve where latency starts rising steeply; capacity past it is unusable. Taught in Chapter 3: Performance Testing Engagements
  • KV bytes per token: 2×layers×KV heads×head dim×bytes per value2 \times \text{layers} \times \text{KV heads} \times \text{head dim} \times \text{bytes per value}. Taught in 8.2 Qualifying and sizing the engagement
  • Pre-registration: freezing the dataset, template, revision, rubric, and thresholds before the first run. Taught in 8.4 Pre-registering the POC
  • Prefix caching: reusing the KV cache of a byte-identical shared prompt prefix so it is computed and stored once per replica. Taught in Chapter 2: Qualification and Sizing
  • Proof of concept (POC): a time-boxed test whose agreed criteria decide whether to migrate, extend, or stop. Taught in Chapter 4: POC and Evaluation
  • TCO: total cost of ownership, including GPU time, utilization, engineering, capacity risk, and hidden costs. Taught in Chapter 6: Commercials and Security
  • TTFT / TPOT: time to first token and time per output token, the two latencies a streaming user feels. Taught in Chapter 1: Discovery
  • Zero data retention: a requirement that no prompt or completion data, including in logs and metrics, is kept by the vendor. Taught in Chapter 1: Discovery
  • Zero data retention (ZDR): prompts and completions are not stored after the request; what else is kept must be stated exactly. Taught in Chapter 6: Commercials and Security